page_banner

News

Hello, come to consult our products !

The History of SPM CALM Buoy System


        Since being introduced, SPMs facilitated economies of speed and scale in the international transport of petroleum. And as the market for these SPM systems developed rapidly the decision was taken in 1969 by N.V. Industrieele Handels Combinatie Holland (IHC) to create a separate business to market and further develop the products, called Single Buoy Moorings Inc. (or SBM). Their success has become eponymous, as SPM CALM type are now common, but technically incorrectly referred to as SBM or Single Buoy Mooring.

The history of single point mooring in the oil and gas industry started in the late fifties with loading/ discharging terminals using single point mooring systems. In particular with:

  • 1959: Shell, Malaysia (48 ft water depth), CALM Type Gusto constructing the first single point mooring (SPM) facility under a license agreement with Shell, with the concept developed by Esso.
  • 1969: Esso, Bregia Libya (140 ft water depth) SALM Type (this was an old Exxon patent)

 

 

       Hebei Zebung Plastic Technology Co. , LTD. It was founded in 2003 with a registered capital of 56.9 million yuan. IS A HIGH-TECH R & D and Production Enterprise engaged in the field of large-caliber marine oil pipeline, industrial and civil fluid hose, dredging hose, food hose, etc. . Zebung technology in the field of rubber pipeline ploughed 19 years, through continuous scientific and technological innovation and technological breakthroughs, many products have been in the global leading level. In the field of high-end offshore oil pipeline, Zebung is the only domestic independent R & D Offshore Oil Pipeline Project Enterprises. In particular, the self-developed offshore floating tubing and underwater tubing, Zebung is the first domestic research and development through the French BV Classification Society on the GMPHOM 2009 standard certified products.


Post time: Sep-27-2023
  • Previous:
  • Next:

  • WhatsApp Online Chat !